Fitzgerald (Civil Engineer Contractors)

A49 Wistanstow

£400,000

The scheme was principally the stabilisation of an existing embankment and removal of an adverse camber that was worsening as the embankment failed causing the location to be an accident blackspot.

The works consisted of the construction of a gabion retaining wall, repairs and extension of the existing culvert along with a new headwall structure. A new regulated carriageway over the existing carriageway to lift the levels producing the new super elevated profile.