Fitzgerald (Civil Engineer Contractors)

Shirley Parkgate

£3.7 million

A Section 278 highway improvement scheme for a major development in Shirley. The main section of works involved converting an existing signalised cross roads on a major arterial route into Birmingham carrying significant and constant high levels of traffic flow, into a signalised gyratory to greatly improve the through flow.

Due to the site location next to a BT exchange, a major diversion of the BT was required with a 48 way BT duct and large reinforced concrete chambers being constructed.

Accreditations and Affiliations