Fitzgerald (Civil Engineer Contractors)

Sainsburys, Leek

£3.2 million

Construction of a new access road including roundabout and carriageway re-profiling for a new Sainsburys and industrial units. Other works involved the installation of highway drainage a new foul water sewer requiring two S104 agreements. The Section 38 works involved the construction of a circulatory road system linking the new access off the Macclesfield Road with the new Sainsbury and Industrial Units. The road required two new bridges to be constructed over the River Churnet within the main body of the Section 38 works along with a third bridge for future development.

Accreditations and Affiliations